
MTE MSVT 20
Brand :
MTE Meter Test Equipment AG
Categories :
STATIONARY TEST EQUIPMENT
, TESTING OF CLOSED LINKS
, Accessories
For the testing of multiple single-phase meters with fixed links between the voltage and current path on a test bench galvanic isolation must be provided at each test position. This can be done with isolation transformers for the voltage path or the current path at each position.